Kopron | News of Steel buildings, Loading bays, Industrial doors
Efficiency

Departments of R & Dto improve mechanical ,design and functionalitywith focus on energy saving .

infinite warranty

Compliance with the highest quality standards for : design, construction , installation and after sales service.

integrated planning

Integrated planning and keys in hand on time and costs.

Safety

Compliance with the regulations of each product in each country , for maximum security .

History

35 years of history with a consolidated know-how and evolving.

Personalized solutions

Standardization and personalization: design and production flexibility in all accomplishments.

Quality and design

Structural quality and attention to design, every product is designed to be integrated harmoniously with the environment.

News

  1. FILTER BY
28 sep

Kopron installed for Bertschi AG group a new temporary storage building covering a surface of 5,400 square meters

15 sep

Festa Logistics relies on Kopron for efficient loading bays

02 ago

Mercedes Benz in Sao Paulo shows a 'new face' thanks to industrial steel buildings made by Kopron

27 jul

A new railway station has been opened in Sidi bel Abbes in Algeria with made-to-measure industrial folding doors by Kopron

05 abr

Visit us in Intermodal South America!

21 jul

Kopron "ON AIR" with a new website: www.kopron.com

Name and Surname
Company
Address
Telephone
Email
Product of interest
The fields marked with * are obligatory